Mobile Crane Operation Manual per GB/T 17909.2-2010

GB/T 17909.2-2010, "Cranes — Operation Manual — Part 2: Mobile Cranes," is the dedicated standard for preparing mobile crane operation manuals. It specifies the content scope, organizational structure, and drafting rules for operation manuals covering truck cranes, crawler cranes, all-terrain cranes, and other mobile crane types. It is identical to ISO 9928-2:2007 (IDT). A well-structured operation manual is the first line of defense in ensuring safe crane use.

GB/T 17909.2-2010 is Part 2 of the crane operation manual standard series, specifically governing the content, format, and requirements for mobile crane operation manuals. A compliant manual is a critical technical document for the safe operation of mobile cranes. This article provides a detailed breakdown of the standard's drafting requirements.

GB/T 17909.2-2010 mobile crane operation manual standard


Standard Positioning and Manual Compilation Principles

GB/T 17909.2-2010, identical to ISO 9928-2:2007 (IDT), is a specialized standard for drafting mobile crane operation manuals, built upon the general principles of GB/T 17909.1. It applies to the preparation of operation manuals for all types of mobile cranes, aiming to standardize the content framework and technical language. This ensures that manuals from different manufacturers and for different models share a consistent information structure, enabling operators to quickly locate critical data. Manual compilation must adhere to four core principles: accuracy, completeness, clarity, and operability. All technical parameters and operational procedures must be validated through practical testing.

Core Content Structure of the Manual

The standard specifies that a mobile crane operation manual must include the following sections (in the recommended order):

Section 1: General Information — Complete product model identification, manufacturer details, equipment serial number, and date of manufacture; the crane's scope of application and operating limitations; manual version number and revision history.

Section 2: Technical Parameters — Rated lifting capacity charts and working range diagrams (covering all outrigger configurations and telescopic boom combinations); main structural dimensions and weights; engine/electric motor specifications; hydraulic system parameters (system pressure, hydraulic pump flow, oil tank capacity); tire specifications and ground bearing pressure; travel parameters (travel speed, gradeability, turning radius).

Section 3: Transport and Installation — Transport dimensions and weights; transport securing requirements; on-site assembly and commissioning procedures; boom extension and retraction operating procedures.

Section 4: Operating Instructions — Pre-operation safety inspection checklist; start-up and preheating procedures; travel operating procedures; lifting operation procedures (hoisting, slewing, luffing, telescoping); outrigger operating procedures; emergency operation procedures (procedures for engine failure, hydraulic system failure, etc.).

Section 5: Safety Devices — Operating instructions and alarm meanings for the load moment limiter (LML); functions and test methods for each limit switch (hoisting height limiter, working radius limiter, slewing limit); setpoints for the anemometer and inclination alarm; location and use of the Emergency Stop Button.

Section 6: Maintenance — Daily inspection items (pre-shift inspection); periodic maintenance schedule and tasks (based on engine operating hours or calendar intervals); lubrication chart and lubricant specifications; replacement intervals and capacities for hydraulic oil, engine oil, and coolant.

Section 7: Troubleshooting — A comparison table of common faults, probable causes, and troubleshooting methods. Section 8: Transport and Storage — Crane transport requirements and long-term storage conditions. Section 9: Scrapping and Disposal — Discard criteria for main structural components.

Rated Lifting Capacity Chart
All operating condition combinations
Outrigger / Boom / Slewing angle
Working Range Diagram
Jib length / Radius / Height
Curve chart
Safety Devices
LML + Limit switches
Setpoints and testing
Maintenance
Daily + Periodic schedule
Lubrication chart
Troubleshooting
Fault / Cause / Remedy
Comparison table
Load Chart Format
Charts + Text
Bilingual (CN/EN)

Requirements for Preparing the Rated Lifting Capacity Chart

The standard provides detailed rules for the most critical element of the manual — the rated lifting capacity chart. The chart must list rated capacities for every combination of fully extended outriggers, partially extended outriggers, various telescopic boom lengths, different working radii, and different slewing angles. The table format must use a "radius — lifting capacity" correspondence, with the radius column as the first column (increments of 0.5 m or 1 m from minimum to maximum radius), and different boom lengths and outrigger configurations listed in separate columns. The chart's valid range must cover from the minimum radius to the rated maximum radius. The chart must include a note stating "Values in this table include the weight of the hook and lifting spreader" or otherwise specify how hook weight is deducted. The chart must account for ground bearing pressure limitations of the outriggers (e.g., derating when ground bearing capacity is insufficient). The load capacity chart must be presented on a dedicated page, with legible text and a minimum size of A4.

Working Range Diagram

The working range diagram must graphically illustrate the lifting height envelope of the mobile crane at various boom lengths and working radii. The diagram must indicate: the crane's slewing center position, radius-height relationship curves for each boom length, rated lifting capacities marked at corresponding points on the curves, outrigger positions and ground contact areas, and the working range after installation of the jib (if applicable). The scale of the diagram must be clearly indicated — an unclear scale is more dangerous than no scale at all. An example should be provided in the manual's appendix to demonstrate how to read the working range diagram.

Key Points for Safe Operating Instructions

The operation manual places particular emphasis on the following safe operation points: never overload the crane (the values in the load capacity chart represent the rated load capacity limits, not recommended working loads); outriggers must be fully extended and set on firm, level ground before lifting; the wind speed during operation must not exceed the specified limit (generally ≤7 on the Beaufort scale, subject to the manufacturer's specifications); no one is permitted to stand beneath the boom; avoid sudden starts or emergency stops during hoisting operations; lifting on slopes is prohibited (if the levelness of the entire machine exceeds 1%, adjustments must be made before proceeding); during rotation, keep a close watch on the clearance between the boom and any obstacles; and if any abnormal noise, vibration, or tilt is detected, stop the operation immediately and investigate the cause. The operation manual delivered with every Kelude crane is compiled strictly in accordance with this standard, available in both Chinese and English, and includes a complete load capacity chart and working range diagram.


Mobile Crane Operation Manual: Parameter Comparison Table

The comparison table below outlines the core parameter configuration for mobile crane operation manuals, serving as a reference for equipment selection and operational use.

← Scroll left / right to view full table →
Documentation Itemcontent requirementsApplicable Crane ModelsDocumentation Notes
Technical ParametersLifting Capacity/Working radius/Mainjib length DegreeTruck-Mounted/Crawler/Rough Terrain CraneIncluding Load Chart
operating instructionsEachmechanism Operating ProceduresModel-Specific InstructionsIncludingsafety precautions
maintenanceDaily/Monthly/Annual MaintenanceListed by Crane ModelIncluding Maintenance Schedule
safety regulationsProhibited Operating Conditions/emergency planCommon to All ModelsIncluding Load Safety Instructions

Frequently Asked Questions

Q: Why does the mobile crane operation manual place such strong emphasis on the load capacity chart?
A: The rated lifting capacity of a mobile crane varies dramatically across different operating conditions. Take a 50t truck crane as an example: with outriggers fully extended, a jib length of 10.5m, and a working radius of 3m, the rated lifting capacity can reach 50t. However, with outriggers half-extended, a jib length of 42m, and a working radius of 12m, the rated lifting capacity may drop to just 3t. If an operator relies on experience rather than consulting the load capacity chart, the risk of overload and overturning increases significantly. This is why the load capacity chart is the most frequently referenced page in the operation manual—standard requirements mandate that it be clear, complete, and fixed in a readily accessible position within the operator cab.
Q: What language requirements apply to the Operation Manual?
A: Standard requirements stipulate that the Operation Manual must be written bilingually in Chinese and English (with the Chinese version prevailing for equipment used domestically, while export units must include a translated version in the destination country's language). Technical terminology must follow national standard terms (as defined in the GB/T 6974 series), avoiding colloquial or company-internal language. Units of measurement must comply with legal metrological units (kg, m, N·m, MPa, etc.). Graphics and tables should use clear lines and sufficiently large font sizes, with a minimum body text size of 8pt and a minimum of 10pt for the Load Capacity Chart.
Q: What are the requirements for managing revisions to the Operation Manual?
A: The standard requires that a version management system be established for the Operation Manual. The manual must be updated accordingly after every technical change, with the new version clearly indicating the version number and revision date, and a summary of all revisions listed on the title page. Manufacturers are required to proactively provide the updated manual to users of equipment already in service. The Operation Manual must be kept for the entire service life of the equipment, and retained for at least 2 additional years after the equipment is scrapped. If the manual is lost, a replacement must be requested from the manufacturer immediately; electronic printouts are not acceptable substitutes for the official bound manual.
Q: Does the Operation Manual for mobile cranes include wire rope replacement criteria?
A: Yes. The standard specifies that the Operation Manual must include the wire rope specification and model, rated length, replacement criteria, and scrap criteria. Wire rope scrapping requirements are based on ISO 4309 (covering number of broken wires, diameter reduction, corrosion, wear, and deformation). The manual must also describe the installation method, pre-tensioning requirements (to eliminate constructional elongation of new rope), and Daily Inspection methods for in-service use. In addition, the manual must state the safety factor between the rope's minimum breaking force and the rated load—typically ≥3.5 for mobile-type cranes.

Related News

contact

contact us

phone:
+86 13903802779

mail:3915269@qq.com

Working hours: Monday to Friday

Wechat
Wechat
SHARE
TOP